Fly over Tucson Electric's preferred route for new midtown power line
- Courtesy Tucson Electric Power Co.
- Updated
View maps and watch a flyover of the route Tucson Electric Power Co. prefers for its proposed 138-kilovolt transmission line, the Midtown Reliability Project. For the entire video, including non-preferred routes, go toΒ tucne.ws/mrpfly.
tucne.ws/mrpfly
Tags
As featured on
Tucson Electric Power officials at the kickoff of state hearings on Monday stressed the urgent need for a new, high-voltage transmission line through midtown.
Tucson has the authority to reject Tucson Electric Power Co.'s plan to build overhead high-voltage transmission lines through midtown, a judge ruled.
For Star subscribers:Β A state line-siting panel is scrutinizingΒ Tucson Electric's proposal for a new high-voltage power line through midtown block by block, foot by foot.
Latest video
View this profile on Instagram#ThisIsTucson π΅ (@this_is_tucson) β’ Instagram photos and videos
Most viewed stories
-
This new restaurant is coming soon, bringing Southern favorites to Tucson
-
60 fun events happening in Tucson this weekend Sept. 19-22 π₯¨
-
60 fun events happening in Tucson this weekend Sept. 12-15 πΌπ¬
-
This nameless taco stand makes delicious al pastor tacos straight from the trompo
-
The iconic Barbie truck is returning to Tucson with exclusive merch π
-
100 fun events happening in Tucson this September 2024 π»πΆ
-
35 FREE events happening in Tucson this September 2024 πΈ
-
Where should I eat in Tucson? A GIANT list of bucket list spots for every craving
-
At 6 months old, Tucson's baby elephant has made her way into the big girl pool
-
This local market turns Hotel Congress into a monthly hub of vintage clothing